Skip to article frontmatterSkip to article content
Site not loading correctly?

This may be due to an incorrect BASE_URL configuration. See the MyST Documentation for reference.

Grant County's load and the Columbia

Grant PUD's load has grown enough since 2019 that an ordinary autumn now needs more power than its own dams make

Quincy, in Grant County, Washington, has become a data-center town. The servers came for cheap electricity from the Columbia River. Grant County PUD, the public utility there, owns two dams on the river, Priest Rapids and Wanapum, and supplies the county’s homes, farms and data centers. I wanted to see how much the county’s demand for power has grown since 2019, and how it compares with what those two dams can make from the river month by month.

Where the data comes from

Every utility or agency that keeps supply and demand matched on its own patch of the US grid, a balancing authority, reports its load and generation to the Energy Information Administration each hour, on form EIA-930. Grant PUD reports as GCPD, and its hydro generation is essentially the output of its two dams. For the river I use the USGS gauge just below Priest Rapids Dam, the lower of Grant’s two dams, which measures the water that has just run through both of them.

How Grant’s load has grown

<Figure size 975x468 with 1 Axes>

Grant’s average load, each year compared with 2019, rose every year from 2020 to 2025. To see whether that is unusual I drew its neighbours in grey. Douglas PUD, across the river in East Wenatchee and also home to data centers, grew even faster from a smaller base. Chelan PUD and the Bonneville Power Administration grew by less than 10%. I left 2026 out because December is not in yet.

How the river makes power

The power a dam makes depends on how much water goes through its turbines and how far that water falls, which is called the head. Turbine flow keeps pace with river flow only up to a point. When the river runs higher than the turbines can take, the extra water goes over the spillway and makes no power, and high water backs up below the dam and shortens the fall.

<Figure size 975x572 with 1 Axes>

Each dot is one day from 2019 to October 2026. Up to about 150,000 cubic feet per second, each extra thousand adds roughly 11 MW. Above about 170,000 the output levels off near 1,400 MW, however high the river runs.

At the same flow, days from November to March make more power than days from April to August, and reach 1,700 MW. My guess is the spill for young salmon: in spring and summer the dams send some water over the spillway on purpose, to help the fish downstream. I haven’t yet checked this against Grant’s operating rules. The September and October days line up with the winter days, which fits the guess, since as I understand it the fish spill ends in late summer. Those autumn days also sit at the low end of the curve, where every thousand cubic feet per second lost costs the most power.

Load growth or drought?

Grant’s load first ran above its dams’ output in 2023, a dry year, and I wanted to know whether the cause was the growing load or the low river. To separate the two, I kept each month’s actual hydro output and compared it with two steady loads: the 2019 average of 612 MW and the 2025 average of 769 MW.

<Figure size 975x468 with 1 Axes>
Loading...

With the 2019 load, Grant’s dams would have fallen short in only one month in nearly eight years, September 2023, and then by just 5 MW. With the 2025 load they would have fallen short in six of the eight Septembers and six of the eight Octobers, and in four other months (two Aprils, a March and a February): at least once in every year except 2020. Even in ordinary years like 2019 and 2021, today’s load would have outrun the river in early autumn. The growth in load is what changed, and the low autumn river decides which months feel it.

Some caution

Grant sells a share of its dams’ output to other utilities under long-term contracts and buys power on the wider grid, so a month when its load tops its hydro output is a sign of pressure. The lights stay on, and Grant leans on the wider grid at the time of year when the whole river is low.

EIA-930 counts all of Grant’s load together and doesn’t separate the data centers. The steady rise in the floor of the load looks to me like servers running day and night, but that is my reading of the curve.

I used a steady load to keep the comparison simple. Real load peaks in July, so the months over in the table are a first estimate.

What I want to look at next

I’d like to check the two-curves guess against Grant’s spill schedule, and look at the head at each dam from its water levels above and below. I’m also curious about the snowpack and glacier melt that keep the late-summer river up. Farther upstream, Grand Coulee and the Canadian dams under the Columbia River Treaty decide much of what reaches Grant in the first place.

Data